GIEC OpenIR

Browse/Search Results:  1-6 of 6 Help

Selected(0)Clear Items/Page:    Sort:
BBDB wave energy conversion technology and perspective in China 期刊论文
OCEAN ENGINEERING, 2018, 卷号: 169, 页码: 281-291
Authors:  Wu, Bijun;  Li, Meng;  Wu, Rukang;  Chen, Tianxiang;  Zhang, Yunqiu;  Ye, Yin
Favorite  |  View/Download:159/0  |  Submit date:2020/10/29
Wave energy  Backward bent duct buoy (BBDB)  Capture width ratio (CWR)  Wave-to-wire conversion efficiency  
Economic assessment of wave power boat based on the performance of "Mighty Whale" and BBDB 期刊论文
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 卷号: 81, 页码: 946-953
Authors:  Wu, Bijun;  Chen, Tianxiang;  Jiang, Jiaqiang;  Li, Gang;  Zhang, Yunqiu;  Ye, Yin
Favorite  |  View/Download:189/0  |  Submit date:2020/10/29
Wave energy  "Mighty Whale"  Wave power boat  Electricity cost  
Flume experiment study on capture width ratio of a new backward bent duct buoy with a pentagon buoyancy cabin 期刊论文
OCEAN ENGINEERING, 2017, 卷号: 141, 页码: 12-17
Authors:  Chen, Tianxiang;  Wu, Bijun;  Li, Meng
Favorite  |  View/Download:170/0  |  Submit date:2017/12/31
Backward Bent Duct Buoy  Capture Width Ratio  
改进型中心管模型能量转换性能试验及样机设计 期刊论文
海洋工程, 2017, 卷号: 35, 期号: 1, 页码: 97-104
Authors:  吴必军;  李猛;  陈天祥;  伍儒康
View  |  Adobe PDF(1661Kb)  |  Favorite  |  View/Download:292/114  |  Submit date:2018/12/21
波浪能  中心管  振荡水柱  俘获宽度比  海洋仪器  波力发电  wave energy  centre pipe  oscillating water column  capture width ratio  oceanographic instruments  wave power  
中心管底部形状对浮标波能转换性能影响的实验研究 期刊论文
新能源进展, 2016, 期号: 1, 页码: 15-19
Authors:  李猛;  陈天祥;  伍儒康;  吴必军
View  |  Adobe PDF(1181Kb)  |  Favorite  |  View/Download:347/128  |  Submit date:2017/12/31
波力发电浮标  模型  中心管  俘获宽度比  波周期  
后弯管波浪能利用技术及样机设计 期刊论文
海洋技术学报, 2016, 期号: 5, 页码: 10-16
Authors:  吴必军;  李猛;  伍儒康;  陈天祥
View  |  Adobe PDF(1806Kb)  |  Favorite  |  View/Download:409/146  |  Submit date:2017/12/31
波浪能  后弯管  俘获宽度比